Project Description

Works were to remove existing conservatory and replace with new hipped extension with crank steel and vaulted ceiling. Internally the 1970’s bungalow was completely renovated inclusive of a new kitchen. In addition, a new block paver driveway was installed along with flagstone paths.

 

Project Details